1

Client: IGM Trade, Kavadarci.

Main Contractor:

KONCAR D&ST

Assembly and (SAT) Testing of electrical parameters and auxiliary equipment of Power Transformer 40 MVA; 110/10.5 kV

- SS 110/10.5 kV Kavadarci, N. Macedonia

2023


1pcs.

2

Client: Elbndertuesi, Elbasan, Vlore, Albania.

Testing and Commissioning services of two Power Barges (SS Tiger I & SS Tiger III)

2023

3

Client: Semco Maritime.

Main Contractor: SIEMENS KPT

HAT Testing of electrical parameters and auxiliary equipment for Project Vineyard 450 in Odense, Denmark of:

- Power Transformer 400MVA; 220/66 kV

- Auxiliary Earthing Transformer 66/0.4 kV

- Shunt Reactor 220 kV

2023


2pcs.

2pcs.

2pcs.

4

Contractor:

KONCAR D&ST

Assembly and (SAT) Testing of electrical parameters and auxiliary equipment of Power Transformer 35 MVA; 115/30 kV

- SS 115/30 kV Chotkow, Poland

2023


1pcs.

5

Client: TenneT,

Main Contractor:

SIEMENS KPT

Installation activities and HAT Testing of Power Transformer 400 MVA 220/66/66 kV for off-shore platform

- SS Tennet

2023


2pcs.

6

Client:TRANSCO - Abu Dhabi Transmission & Despatch Company.

Main Contractor:

Siemens KPT

Finishing installation activities and SAT Testing of Power Transformer 500 MVA; 400/220/34.5 kV

- SS 400kV CPTL Mahawi

2023


1pcs.

7

Main Contractor: SIEMENS Energy Oy.

Sub-contractor: SIEMENS KPT

Supervision and Testing of electrical parameters and auxiliary equipment Power Reactor 50 MVA; 347 kV

- SS Elering 50, Estonia

2022



1pcs.

8

Dubai Electricity & Water Authority (Transmission Power Division) - Main Contractor: El Sewedy & Siemens; Sub-Contractor: Siemens KPT

Supervision and Testing of electrical parameters and auxiliary equipment and Commissioning of Step Up Transformers 385 MVA; 400/20.5 kV

- Aweer Power Plant, Phase IV

2022


3pcs.

9

Contractor:

KONCAR D&ST

Assembly and (SAT) Testing of electrical parameters and auxiliary equipment of Power Transformer 40 MVA; 110/33 kV

- SS 110/33 kV Neinborstel, Germany

2022


1pcs.

10

Client: ESPANA, ENDESA Distribucion, Xerta.

FAT Testing of Power Transformer 40MVA; 110/26.4 kV

2022

1pcs.

11

Main Contractor: SIEMENS KPT

Supervision of assembly and testing of Power Transformer 100 MVA 400/20/20 kV

- SS 400 kV Mouzaki, Greece

2022


1pcs.

12

Client: Bahwan Engineering Company - BEC L.L.C, Oman Electricity Transmission Company SAOC.

Main Contractor:

SIEMENS KPT

Supervision of SAT Testing of Power Tranformer 500 MVA; 400/132/33 kV

- SS Duqm

2022


2pcs.

13

Manufacturer:

Siemens KPT;

Sub-Contractors: Petrofac & Linxon

Supervision of preparing the Power Transformers for putting into operation 390 MVA; 220/66 kV, off-shore substation, Project SEEGREEN, Scotland UK

2022


3pcs.

14

Manufacturer: Siemens KPT;

Sub-Contractors: Petrofac & Linxon

Preparing the Power Transformer 410 MVA; 275/220/29 kV for final SAT Commissioning, on-shore substation - Tealing, Projcet SEEGREEN, Scotland UK.

2022


3pcs

15

Contractor:

KONCAR D&ST

Assembly and (SAT) Testing of electrical parameters and auxiliary equipment of Power Transformer 80 MVA; 110/20 kV

- SS 110/20 kV Gothendorf, Germany

2022




1pcs.

16

Client: Zawawi PowerTech Engineering, L.L.C, Oman Electricity Transmission Company SAOC.

Main Contractor:

SIEMENS KPT

Supervision of SAT Testing of Power Transformer 500 MVA; 400/132/33 kV,

- SS Barik

2022


4pcs.


17

Mouzaki, Storage Facility

Main Contractor:

SIEMENS KPT

Visual inspection and On-site testing dew point and insulation resistance testing of Power transformer 100 MVA; 400/20/20 kV

- Storage Facility, Mouzaki, Greece

2021


1pcs.

18
EVN Macedonia

Assembly and (SAT) Testing of electrical parameters and auxiliary equipment of Power Transformer 40 MVA; 110/36,75/10,50 kV

- SS Shtip 1110/35 kV, Shtip, Macedonia

2021


1pcs.

19
Dubai Electricity & Water Authority (Transmission Power Division) - Main Contractor: DEWA & Siemens;Sub-Contractor: Siemens KPT

Preparation of Power Transformers for long term storage 388 MVA

- SS Jebel Ali

2021 2pcs.
20

SolarPACK, Solar Power Plant 90MW

Contractor:

KONCAR D&ST

Supervision of assembly and (SAT) Testing of electrical parameters and auxiliary equipment of Power Transformer 110 MVA; 132/33 kV - SS 132/33 kV, Kedah, Malaysia
2021 1pcs.
21
SEAGREEN Wind energy - Offshore Substation Site erection & program, Manufacturer: KPT; Sub-Contractors: Petrofac & Linxon
Preparing power transformers for transport 390 MVA; 220/66 kV - Offshore Substation 220/66, UAE
2021 3pcs.
22
CCPP Al Layyah 1026MW, Sharjah Electricity and Water Authority, United Arab Emirates Client: ESP - Elsewedy Contractor: Power, Siemens KPT Croatia, Siemens Trento Italy
Supervision of testing of GSU and UA power transformers: -453MVA, 19/145kV, -417MVA, 19/145kV, -48MVA, 19/6.9 kV
2021 1pcs. 2pcs. 2pcs
23
Libyan Iron and Steel Company, Misrata, Libya Contractor: KONCAR D&ST
Assembly and assembly supervision and testing of power transformer 31,5 MVA; 30/10.5 kV
2021 1pcs.
24
Dubai Electricity & Water Authority (Transmission Power Division) - Main Contractor: DEWA & Siemens; Sub-Contractor: Siemens KPT
Supervision and Testing of electrical parameters and auxiliary equipment and Commissioning of Power Transformers 500 MVA; 400/132/10,47 kV - SS 400/132 kV, Janoub - SS AL Sakhama 400/132/11 kV
2019-2021 4pcs. 4pcs.
25

Contractor:

KONCAR D&ST

Assembly and (SAT) Testing of electrical parameters and auxiliary equipment of Power Transformer 80 MVA; 110/30 kV

- SS 110/30 kV Wessin

2021 2pcs.
26

Contractor:

KONCAR D&ST

Assembly and (SAT) Testing of electrical parameters and auxiliary equipment of Power Transformer 80 MVA; 115/33 kV - SS 115/33 kV Windfang
2021 1pcs.
27
Bucim DOO, Macedonia
Assembly and (SAT) Testing of electrical parameters and auxiliary equipment of Power Transformer 16MVA; 20/6,3 kV - SS 20/6 Borov Dol, Radovish, Macedonia
2021 1pcs.
28
Borov Dol DOOEL, Macedonia
(SAT) Testing of electrical parameters and auxiliary equipment of Power Transformer 6 MVA; 20/6,3 kV - SS 20/6 Borov Dol, Radovish, Macedonia
2021 1pcs.
29
"HE na Drini" Hydropower plant 3x105MW Main Contractor: Siemens KPT
Assembly and (SAT) Testing of electrical parameters and auxiliary equipment of 1ph Power Transformer 115 MVA; 242,78/15,75 kV - SS 220/15 kV, Visegrad, Bosnia
2021 1pcs.
30
Aurubis Bulgaria AD Main Contractor: KONCAR D&ST
On-site testing of electrical parameters and auxiliary equipment of Power Transformer 125 MVA; 110/6,3/6,3 kV -SS 110kv Aurubis, Bulgaria
2021 2pcs.
31
TENT - ObrenovacMain contractor: KoncharEnergetski transformatori d.o.o.
On-site testing of electrical parameters and auxiliary equipment of Power Transformer 360 MVA, 407/15kV -Thermal Power Plant Nikola Tesla, Obrenovac, Serbia
2021 1pcs.
32
ENERGIAKI ARVANIKOU Main contractor: KONCAR D&ST
On-site assembly and Testing of electrical parameters and auxiliary equipment, vacuuming and oil filling of Power Transformer, 80MVA, 150/33kV -SS 150kV Livadi, Greece
2021 1pcs.
33
MAKSTIL AD - Skopje
Inspection and testing of a Transformer, 5.789 MVA 35/0.662 kV
2021
34
EDP Renewables Main contractor: KONCAR D&ST
On-site assembly and Testing of electrical parameters and auxiliary equipment, vacuuming and oil filling of Power Transformer, 50MVA, 115/30kV -SS 115/30kV Dobrzyca, Poland
2021 1pcs.
35
WPD INFRASTRUKTUR GMBH Main contractor: KONCAR D&ST
On-site assembly and testing of electrical parameters and auxiliary equipment of Power Transformer, 63 MVA 110/33kV - SS 110kV Biegen, Germany
2021 1pcs.
36
Aurubis Bulgaria AD Main contractor: KONCAR D&ST
On-site disassembly of old Power Transformer On-site assembly and Testing of electrical parameters and auxiliary equipment, vacuuming and oil filling of Power Transformer, 80MVA, 110/6kV -SS 110kV Aurubis, Bulgaria
2020
37
Kahramaa, Qatar General Electricity and Water Corporation - Contractor: Siemens KP
Commissioning and testing of electrical parameters and auxiliary equipment of Power Transformers: - SS Doha Super: 200 MVA; 220/66/11 kV - SS Umm Ebariya: 160 MVA; 132/66/11 kV - SS Bul Hemmaid: 500 MVA; 400/132/11 kV - SS Doha Super: 400 MVA; 400/220/32/11 kV - SS Doha Super: 500 MVA; 400/220/32/11 kV - SS Logistic Zone Super:500 MVA; 400/132/11 kV - SS Al Shakama: 500 MVA; 400/132/11 kV - SS Doha West Metro: 315 MVA; 220/132/33 kV - SS Pearl 2: 275 MVA; 132/66/11 kV - SS Ras Abu AS: 200 MVA; 220/66/11 kV - SS Wakra Replacement: 160MVA; 132/66/11 kV - SS Doha West Metro: 100 MVA; 132/33 kV - SS Lusail Central Metro: 100 MVA; 132/33 kV - SS Al Waab: 100 MVA; 132/33 kV - SS Al Sowaidi: 500 MVA; 400/132 kV
2016-2020 1 pcs. 2 pcs. 2 pcs. 1 pcs. 1 pcs. 3 pcs. 3 pcs. 2 pcs. 2 pcs. 1 pcs. 2 pcs. 2 pcs. 2 pcs. 2 pcs. 3 pcs.
38
MZT Energetika, Macedonia
Inspection and testing of: - Sub-Station 35/10kV, 4 MVA power transformers - Sub-Stations 10/0.4 kV - Relay protection - Circuit breakers - Disconnectors - Cables
2014-2020 1 pcs. 16 pcs.
39
Dubai Electricity & Water Authority (Transmission Power Division) - Main Contractor: DEWA & Siemens; Sub-Contractor: Siemens KPT
Supervision and Testing of electrical parameters and auxiliary equipment and Commissioning of Power Transformer - SS 400/132 kV Janoub
2019-2020 4 pcs.
40
Elektrodistribucija dooel, North Macedonia Main contractor: KONCAR D&ST
Witnessing and verification of FAT, on-site assembly and testing of electrical parameters and auxiliary equipment of power transformers 35/21(10.5)kV, 10 MVA - SS Janche - SS Pesochani - SS Demir Kapija - SS Bukri
2019 1 pcs. 1 pcs. 1 pcs. 1 pcs.
41
SS Koman, Albania Contractor: Siemens KPT
Flexible separator replacement on Mono-phase Power Autotransformer 115 MVA; 220/400 kV after oil leakage separator relay alarm;
2019 1 pcs.
42
Uganda, SS Soroti Contractor: Koncar D&ST
On-site assembly and testing of electrical parameters of Power Transformer - 40MVA; 132/33kV
2019 1 pcs.
43
Danska, SS Idomlund Contractor: Siemens KPT
Performing Site Acceptance Test of PTR: - 400MVA; 410/167kV
2019 1 pcs.
44
SS Buchim, North Macedonia Contractor: Koncar D&ST
Witnessing and verification of FAT, On-site assembly and testing of electrical parameters of Power Transformer - 16 MVA; 110/6.3/20 kV - 6 MVA; 20/6.3 kV
2019 1 pcs. 1 pcs.
45
Saudy Electricity Company Main Contractor: ABB Contractiong Co. Ltd. Supplier: Koncar
Witnessing and verification of FAT - Neutral Current Transformer - Neutral Voltage Transformer
2019 3 pcs. 3 pcs.
46
SS 110/20 kV Neokazi, Probistip, North Macedonia Contractor: Cranfield Foundry
Testing of electrical parameters in 110/20kV substation equipment of: - Combined / instrument transformers (current/turns ratio, polarity check, auxiliary connections check, grounding) - Disconnectors (visual inspection, contact resistance) - Circuit breakers (visual inspection, contact resistance, Evaluation of synchronization (simultaneity) between the circuit breaker poles - Low voltage installations - Grounding resistance of transmission towers - Relay protection testing
2019 49 pcs. 30 pcs. 12 pcs.
47
ESM, North Macedonia
Dissolved gas analysis and Physical-chemical oil tests on power transformers
2019 48 pcs.
48
OST - Operatori i Sistemit te Transmetimit (Transmition System Operator Albania)
On-site routine transformer testing: - SS Elbasan: 1 120 MVA; 220/115/37.6 kV - SS Elbasan: 1 90 MVA; 220/115/38.5 kV - SS Babice: 100 MVA; 220/115/37 kV - SS Tirana 1: 120 MVA; 220/115/37.6 kV - SS Tirana 1: 63 MVA; 220/21.6 kV - SS Zemblak: 150 MVA; 400/115/20 kV - SS Elbasan 2: 300 MVA; 410/220/30 kV - SS Tirana 2: 120 MVA; 220/115/21 kV - SS Fier: 120 MVA; 220/115kV - SS Bistrica: 80MVA; 160/115/6.6 kV - SS Rrashbull: 100 MVA; 230/115/20 kV - SS Sharre: 100 MVA; 220/115/20 kV - SS Vau i Dejes: 120 MVA; 230/121/10.5 kV - SS Koplik: 90MVA; 220/115/38.5 kV - SS Burrel: 60 MVA; 230/121/11 kV
2018-2019 2 pcs. 1 pcs. 2 pcs. 3 pcs. 2 pcs. 2 pcs. 6 pcs. 2 pcs. 3 pcs. 1 pcs. 2 pcs. 2 pcs. 2 pcs. 1 pcs. 2 pcs.
49
Distribution of Heat - Balkan Energy DOOEL Skopje TO Istok TO Zapad
Inspection and testing of: - medium voltage motors (6kV, 315kVA) - relay protection First technical inspection of 10 kV switchboard Inspection and testing of: - medium voltage motors (6kV, 315kW) - capacitor banks (6kV and 0.4kV) - earthing- lightning system - touch and step voltages Inspection and testing of: - medium voltage motors (6kV, 560kW) - relay protection Inspection and testing of: - medium voltage motors (6kV, 560kW) - capacitor banks - earthing- lightning system - touch and step voltages
2014-2019
50
Elektrodistribucija dooel, North Macedonia Main contractor: ITIS Sub-Contractor: Elektroistok izgradnja Beograd
Replacement of the motor drive unit of On-Load Tap Changer of power transformer in SS 110/35kv Stip 1
2018
51
Hydro Power Plant MWANDINGUSHA, DR Kongo - Main Contractor : Koncar DIST
Supervision of on-site assembly and testing of electrical parameters of PTR - 35 MVA; 110/6.6 kV
2018 3 pcs.
52
SS Boutleis, Boutleis, Algeria Contractor: Siemens KPT
Performing Site Acceptance Test of PTR: - 303 MVA; 220/15 kV
2018 2 pcs.
53
FENI Industries AD Macedonia
Inspection and testing of Dynamic Resistance of: - Furnace single-phase transformers 28MVA; 35/0.8kV - Power transformers 20MVA; 110/6.3 kV
2018 6 pcs. 2 pcs.
54
AIN ARNAT - Combined Cycle Power Plant 1015 MW, Setif, AlgeriaContractor: Siemens KPT
Commissioning and testing of electrical parameters and auxiliary equipment: - 420 MVA; 420/22 kV - 30 MVA; 22/6.3 kV
2017-2018 3 pcs. 3 pcs.
55
TITAN Group, Usje Cement Factory A.D. Skopje Cement factory Base - Govrlevo
Inspection and testing of: - power transformer: 20 MVA; 110/6kV - circuit breakers (6kV) - earhing and lightning protection systems Inspection and testing of: - capacitor banks (3.46kV, 200kVAr) Inspection and testing of: - power transformers (35/0.4kV, 1600kVA)
2014-2018 2 pcs. 2013 2014
56
Elektrodistribucija dooel, North Macedonia Main contractor: ETD Slovenia
Vacuuming and oil filling of power transformers 40 MVA, 110/10 kV, oil sampling - SS Kozle - SS Bitola - SS Struga/Tetovo
2017 1 pcs. 1 pcs. 1 pcs.
57
EVN Macedonia
On-site disassembly of old power transformer. Witnessing and verification of FAT, assembly and commissioning of refurbished power transformer - SS 110/10.5 kV Kozle Istok, 31.5 MVA On-site testing of electrical parameters of power transformers: - SS 110/35/10 kV Jug Nova, 31.5 MVA; - SS Strumica: 31.5 MVA; 110/10.5 kV Witnessing and verification of FAT, on-site assembly supervision and SAT of 4 distribution TR 35(20)/10 kV, 10 MVA: - SS Radishani, Skopje - SS Porcelanka, Veles - SS Madzari, Skopje - SS Demir Kapija, Demir Kapija
2017 1 pcs. 2017 1 pcs. 1 pcs. 2017 1 pcs. 1 pcs. 1 pcs. 1 pcs.
58
MHE Recica Contractor: Energomont MZT HERC
First technical inspection before putting into operation of the hydro power plant
2017
59
MHE Banjani Contractor: EMK small hydropower plants
Technical inspection of relay protection
2017
60
Jonson Matthey, free industrial zone Bunargic, Skopje, Macedonia
Testing of electrical parameters and auxiliary equipment of dry type transformers - 2500 kVA ; 21/0.4 kV - 3000 kVA; 21/0.4 kV - Relay protection testing
2017 5 pcs. 2 pcs.
61
KORINTOS POWER - Combined Cycle Power Plant, Athens, Greece Contractor: Siemens KPT
Testing of electrical parameters and auxiliary equipment of PTR - 510MVA; 155/19 kV
2016 1 pcs.
62
KOSTT Kosovo - Main Contractor: Siemens KPT
Testing of electrical parameters and auxiliary equipment of power transformer: - SS Peja 3: 300MVA; 400/115/10.5 kV - SS Ferizaj 2: 300 MVA; 400/115/10.5 kV
2016 1 pcs. 1 pcs.
63
Hydro Power Plant - Rapuni - Librazhd, Albania - Main contractor: Koncar D&ST
Supervising of on-site assembly and performing of testing of electrical parameters and auxiliary equipment - HPP Rapuni: 12 MVA; 115/6.3 kV
2016 1 pcs.
64
SGES Montenegro - Main Contractor: Siemens - Sub-contracor: Koncar DIST
On-site assembly and Testing of electrical parameters and auxiliary equipment of PTR - SS Lastva: 20 MVA; 110/36.75(10.5)kV
2016 1 pcs.
65
Dubai Electricity & Water Authority (Transmission Power Division) - Main Contractor: DEWA & ABB; Sub-Contractor: Siemens KPT
Testing of electrical parameters and auxiliary equipment and Commissioning of ATR - Sheikh Mohammed Bin Rashid Solar Park 505 MVA; 400/132 kV
2016 3 pcs.
66
"TE-TO" AD Skopje Combined Cycle Cogeneration Power Plant, Macedonia
Testing of electrical parameters and auxiliary equipment of power transformer: - PTR 290 MVA; 110/15/15kV Electrical Testing of Accu Battery - 2x220VDC; 680Ah - 2x110VDC; 2500Ah - 2x24VDC; 490Ah Testing of electrical parameters of power generator: - 225MVA; 15kV - 87.6 MVA; 15kV Testing of grounding systems and lightning protection
2016 2 pcs.
67
NamPower, Namibia - Main Contractor: Siemens KPT
Testing of electrical parameters and auxiliary equipment , Supervision of vacuuming and oil filling of power transformer of ATR - SS Kuseib: 160 MVA; 220/132/22kV
2016 1 pcs.
68
Airports TAV Macedonia Airport "Alexander the Great" Airport "St. Paul the Apostle"
Inspection and testing of: - low voltage electrical motors Inspection and testing of: - power generators - power transformers 20/0.4kV, 1600kVA - earthing- lightning system Inspection and testing of: - Thermography of low voltage switchboards Inspection and testing of: - power generators - power transforme: 250 kVA; 10/0.4kV - earthing- lightning system
2016 2014,2016 2014,2016 2014-2016 1 pcs.
69
Hydro power plants - JP Strezevo
Inspection and testing of: - AKU batteries
2016
70
Witnessing and verification of FAT - Three phase induction electric motor with squirrel cage
Witnessing and verification of FAT - Three phase induction electric motor with squirrel cage
2016 6 pcs.
71
Skopje City Mall
Inspection and testing of: - power transformer 1600 kVA; 10/0.4kV
2016 1 pcs.
72
TUV Rheinland
Production expediting inspections at SIEMENS Transformers Austria Weiz - 445 MVA; 22/515kV
2015-2016 1 pcs.
73
OKTA Crude Oil Refinery Substation 110/6 kV
Inspection and testing of: - instrument transformers (110kV CT & VT) - thermography of 110kV switchgear First technical inspection of 110kV current transformers Inspection and testing of: - power transformers (110/6kV, 10MVA) - bushing type insulators (110kV) - instrument transformers (110kV)
2015,2016 2015 2012,2016-2018
74
Electrical Power Industry Serbia "EPS" - Main Contractor: Siemens Sub-contracor: Koncar DIST
On-site assembly and Testing of electrical parameters and auxiliary equipment - SS Kopaonik: 31.5 MVA; 110/36.75(10.5)kV
#colspan#
75
Star Energy Oil tanking - Dubai free zone
Inspection and testing of: - power transformers - medium voltage cables 3.3kV - low voltage cables 0.4kV
2015
76
Austrian supply and distribution company - EVN Macedonia - Substation 110/35/10 kV "Petrovec" Substation 110/20/10 kV "Tearce"
Inspection and testing of: - earthing system - touch and step voltages First technical inspection of 35kV and 10kV switchgear First technical inspection of second 110kV transformer bay